Colacem Canada Inc. is proposing to build and operate a cement plant in L’Orignal, Ontario.

The plant will utilize the most advanced production technology available to achieve efficient energy consumption and minimize impact on surrounding ecosystems.

This state of the art technology includes a hybrid air filter to provide reliable dust control, and zero wastewater discharges to the environment.

The plant will have the capacity to produce 3,000 tonnes of clinker per day, with an estimated annual production of 1.16 million tonnes of cement.

Constructing a cement plant is a major project that will provide approximately 200 construction jobs over 2 years and significant economic benefits to the local community. Once completed, the plant will provide long term employment for an estimated 300 people.